Dream Construction is having an expert technical manpower with the engineer & technician for the erection of Power Grid, Sub grid and the high capacity substation with the precaution of quality and the reasonable timing.
Transmission Tower & Substation Civil works with the erection and install Tower & substation equipment. Completed about 50 transmission tower of 33/11 KV with stringing of cable with a minimum time frame maintains the proper quality. We are capable to support the manpower for the erection 132 KV transmission line with the tower erection and stringing the cable with high quality experienced Technician and Engineers.